Reference | Kapasiti | bahan | Weight(kg) | ||
Body | Insert | Screw | |||
HC-5-8 | 5-8MM | Galvanized steel | UV protected neoprene | Galvanized steel | 0.19 |
HC-8-12 | 8-12MM | Galvanized steel | UV protected neoprene | Galvanized steel | 0.19 |
HC-10-15 | 10-15mm | Galvanized steel | UV protected neoprene | Galvanized steel | 0.19 |
HC-15-20 | 15-20mm | Galvanized steel | UV protected neoprene | Galvanized steel | 0.19 |
Key Features:
- Four sizes to cover the full range of ADSS cables from 5 to 20mm..
- Easy install with stainless steel bands or pole bolts.
- The shape of the J Hook allows a running out of the cable directly in the hook
- The suspension clamps can be directly secured to the poles using bolts or bandings. -They can also be installed on hook bolts to provide some flexible suspension point and give extra protection to the cable against wind induced vibrations
- Long service life and low prices.
Installation procedure
- Installation of the J Hooks on the poles :In case the suspension clamps are directly secured t the pole, place them perpendicularly to the cable route and secure them to the pole using bolts or pole banding. Remove the neoprene inserts.In case of suspended J Hooks, install pole brackets or hook bolts at all intermediate poles with angle < 20°. The brackets and/or hook bolts should be positioned on the pole perpendicularly to the cable route.
- Running out and tensioning of the cable :Dead-end the cable at the first end pole.The shape of the JHC enables to run out the cable directly in the J Hooks. Some telecom companies however may require the use of temporary running out rollers. Install them just above the J Hook Clamps. Different models of running our rollers are available from Telenco.Run the cable on the rollers or directly in the J Hooks to the last end pole and tension the cable to its full installation load using a cable grip, a winch and a dynamometer.